Which rehab work needs a permit
In Florida, permits are issued by the local building department, either the city or the county, and requirements vary from one jurisdiction to the next. As a working rule, anything that touches structure, the building envelope or the major systems needs a permit. Purely cosmetic work, such as interior paint, often does not. When in doubt, call the building department or check its website before the contractor starts.
- Roof replacement and most roof repairs beyond minor patching.
- Electrical panel changes, new circuits and rewiring.
- Plumbing repipes, water heater replacement and new fixtures in new locations.
- HVAC replacement, including air handler and condenser changes.
- Window and exterior door replacement, which must meet wind-load requirements.
- Structural work: walls, beams, additions, enclosures and slab or footer repairs.
Investors cannot pull owner-builder permits on flips
Florida allows homeowners to act as their own contractor under an owner-builder exemption, but that exemption is designed for people improving property for their own use and occupancy. It is not meant for houses being built or improved for sale or lease. If you plan to flip or rent the property, plan on licensed contractors pulling the permits for the regulated trades.
That is also the cleanest path for financing. Rehab lenders want to know who is responsible for the work and that it is being done to code. For first-time investors, a licensed contractor on the job is one of the ways to qualify for financing without a long track record, which makes the contractor choice matter twice.
What the Notice of Commencement does
The Notice of Commencement is a short form, signed by the owner, that identifies the property, the owner, the contractor, the surety if there is one, the lender, and a description of the improvement. It is recorded with the county clerk and a copy is posted at the job site. It tells everyone who supplies labor or materials to the job who to send their notices to, and it sets the starting point for lien rights on that job.
In general, Florida requires a recorded Notice of Commencement before the first inspection on improvements above a modest dollar threshold, and a building department will not perform that inspection without it. Some small jobs, such as minor repairs and certain HVAC replacements under a separate limit, are exempt. Your contractor and the building department will tell you when one is required.
Why the lender cares about it
Florida’s construction lien law gives contractors, subcontractors and suppliers the right to file a lien against the property if they are not paid, even if you paid your general contractor in full. The Notice of Commencement is part of the system that keeps those rights orderly. Lenders care because a lien can cloud title and compete with the loan.
For a rehab loan, the lender generally wants the mortgage recorded before any Notice of Commencement, so the loan holds its first position. Draws are then released against completed, verified work. That order of operations is why many lenders and title companies coordinate the recording themselves at or after closing rather than letting a contractor record one early.
Notices to Owner and lien waivers
Once a job starts, subcontractors and suppliers who do not contract directly with you may send a Notice to Owner. It is not a lien and not a sign of trouble. It simply preserves their right to file a lien later if they are not paid. Keep every one you receive, because they tell you exactly who is working on your job and who needs to sign a release.
Before each draw or payment, collect lien waivers or releases from the general contractor and from anyone who served you a Notice to Owner, covering the work being paid for. Before final payment, Florida law requires the contractor to provide a final payment affidavit listing anyone still unpaid. Collect it. That paperwork is how you prove everyone was paid when you sell or refinance.
Inherited permit problems on off-market houses
Off-market houses often come with permit history that needs attention. Open or expired permits pulled by a prior owner can attach to the property and become your problem, because a building department may not issue new permits until old ones are closed, and a buyer’s title company or lender may ask about them later. Unpermitted work, such as an enclosed garage or a converted Florida room, can be even harder to deal with.
Run a permit search with the building department and a municipal lien search during your inspection period. If you find open permits, ask what it takes to close them: a final inspection, an engineer’s letter, or a new permit to legalize the work. Price that into your offer.
Closing out the job
A permit is not finished when the work is finished. It is finished when the final inspection passes and the building department marks it closed. That last step gets skipped surprisingly often, especially on smaller trades like a water heater swap. Then the house goes to sale, the buyer’s title company finds an open permit, and the closing slips while someone schedules a final inspection.
Make closing out every permit part of your punch list. Ask each contractor for the final inspection result, check the permit status online yourself, and keep printouts in your file. When the Notice of Commencement was recorded, confirm whether it expires on its own or whether a notice of termination should be recorded once the work is complete.
Permit timing after storms
Building departments in areas hit by major hurricanes get buried in permit requests, and inspection schedules stretch out. After Hurricane Michael in Bay County in 2018, Ian in Lee and Charlotte in 2022, and Helene and Milton around Tampa Bay and Sarasota in 2024, investors who planned for normal timelines ran into weeks of delay. Some jurisdictions also issue emergency rules after a storm that change what is allowed or how quickly.
Build that into your plan if you are buying in a recently hit area. Submit complete applications the first time, use contractors who know the local department, and schedule long-lead materials early. Ask the building department about current review and inspection wait times before you set a draw schedule, and add the answer to your holding cost estimate. A realistic permit timeline in your plan is cheaper than an optimistic one that runs out of reserves.