Rehab budget

A rehab budget is the itemized cost to bring a property to its planned finished condition, including labor, materials, permits and a contingency.

Think of the rehab budget as the price of turning the house you buy into the house you sell or rent. It should be itemized, room by room or system by system: roof, electrical, plumbing, HVAC, windows, kitchen, baths, flooring, paint, landscaping, permits, dumpsters and cleanup, plus a contingency line. A single lump sum is not a budget. It is a guess, and lenders and contractors both treat it that way.

Each Think Off Market listing carries a line-item rehab estimate so you can see where the money is expected to go before you walk the house. The financing from Think Private Lending covers 100% of the rehab budget, but not up front. It is released in draws as work is completed and verified. That structure rewards a budget that is honest and specific, because each draw request is checked against the line items that were approved.

Take a 1970s block home with a $55,000 budget: $14,000 roof, $9,000 kitchen, $8,000 two baths, $6,500 flooring, $4,500 interior paint, $3,500 electrical panel replacement, $2,500 plumbing repairs, $2,000 permits and fees, $5,000 contingency. When the roofer finishes, you draw against the $14,000 roof line. When the panel is swapped and passes inspection, you draw against electrical. If the kitchen comes in at $11,000, the extra $2,000 comes out of contingency, and the budget still balances.

Florida rehab budgets need lines that investors from other states forget. Roofs and windows often require permits and inspections, and roofing work in Florida must follow the Florida Building Code. If the house sits in a special flood hazard area, the total improvement cost may trigger the FEMA 50% substantial improvement review, which can change the whole project. Older homes may have Federal Pacific or Zinsco panels, polybutylene supply lines or cast-iron drains that insurers flag. Budget for what the insurance inspections will find, not only what buyers will see.

Compare your own contractor’s bid to the listing estimate line by line. Where they differ, find out why. The gap usually points to a scope difference, not a pricing difference.